Wednesday, 24. May 2017

Electrical Engineering

KTH Research Project Database > Electrical Engineering > Power Engineering

Power Engineering



Electrical Machines and Power Electronics


Electric Power Systems


OVERVIEWS

»Research Fields

»Organisational Structure

»Persons


PROJECTS  (12) ORG. UNITS  (11) PERSONS  (8)


12 Projects related to
sorted alphabetically
 
1 / 2
Four-quadrant energy transducer for hybrid electric vehicles - 4QT (Professor Chandur Sadarangani)

Period: 1994-01-01

Previous work within the department has demonstrated the importance of de-coupling the torque and speed of the Internal Combustion Engine (ICE) from the output torque and speed of the drive. This is » more
High performance electrical machines and drives (Associate Professor Juliette Soulard)

Period: 2006-01-01 - 2012-12-30

The competence profile of this research programme is knowledge on the design and development of electrical machines and drives that can achieve high performance for a large set of applications. This » more
Lifetime modelling and management of transformers (Patrik Hilber)

Period: 2009-06-15 - 2014-09-30

The objective of this project is to develop a quantitative probabilistic model, based on both failure statistics and measurements, for the life time of a transformer component. » more
Power market analysis (Professor Lennart Söder)

Period: 1997-10-01

The power market is deregulated in Sweden since 1996 and in many other countries. There are several problems that arise when these new rules are introduced. With the deregulation the power system is » more
Power system analysis (Professor Lennart Söder)

Period: 1998-10-01

The aim of the power system is to transport power from the generating sources to the consumers in a stable way and with a good power quality. Within this project the following issues are » more
Reliability centred asset management (RCAM) (Patrik Hilber)



  Period: 2002-10-01

The research within RCAM develops quantitative models and methods for electrical systems, which relate maintenance effort to system availability and total cost, with the aim to reach an optimal » more
Reliability cost of activities and equipment in the power system (Patrik Hilber)

Period: 2009-11-01 - 2010-12-31

Identifies risks associated with preventive maintenance. » more
Reliability modelling and design for complex power systems (Patrik Hilber)

Period: 2006-01-01 - 2011-09-30

The goal for this project is the development and computer implementation of techniques, models and methods suitable for the assessment of reliability of complex power systems. The project investigates » more
Risks in the electrical distribution systems with optimal maintenance management (Patrik Hilber)

Period: 2006-01-01 - 2011-05-31

There are several risks in the electrical power systems e.g. due to random failure events. This project investigates quantitative methods to assess the probability for failure and how it is related to » more
Soft switched four-quadrant converter with medium frequency transformer (Professor Stefan Östlund)

Period: 2000-07-01 - 2011-05-30

The project studies new soft switched converter topologies for four-quadrant converters having a medium frequency transformer. Interesting applications of such converters are found in e.g. rail » more
   1   2 

SEARCH



»Advanced Search



INFOBOX (0/0) show all
Your infobox is empty




Powered by AVERISinfo@avedas.com